11/2025 – 12/2025

SAP S/4HANA Integration — LOF

Data integration between SAP IBP, SAP S/4HANA and the Data Warehouse using SAP CI-DS — five transactional and ten master data flows — with ABAP RFC functions creating planned orders and purchase requisitions on arrival.

S/4HANASAP IBPSAP CI-DSRFCBDCBAPIData Integration
Client
LOF
Organization
FPT Information System
Role
ABAP Developer — Integration (core team)
Period
11/2025 – 12/2025

What I delivered

  • Designed and implemented data integration flows between SAP IBP, SAP S/4HANA and the Data Warehouse using SAP CI-DS — five transactional data flows and ten master data flows.
  • Developed ABAP RFC functions to receive data from SAP CI-DS, perform transformation, and create planned orders and purchase requisitions using BDC and BAPI techniques.

Context

A short, dense project. SAP Integrated Business Planning (IBP) produces the supply plan; S/4HANA executes it. Between them sits the question every planning integration has to answer: how does a number in a planning tool become a document in the execution system, reliably, every cycle?

The architecture

Fifteen flows through SAP Cloud Integration for Data Services (CI-DS):

  • Ten master data flows — the reference data both systems must agree on. Master data first, always: a transactional flow that lands before its master data is a flow that fails.
  • Five transactional flows — the planning results moving into execution.

On the S/4HANA side, ABAP RFC functions receive what CI-DS delivers, transform it into the shape SAP expects, and create the actual documents: planned orders and purchase requisitions, via BAPI where available and BDC where not.

Design decisions worth recording

Idempotency. A planning cycle can be re-run. If a re-run creates duplicate purchase requisitions, the integration has caused a bigger problem than it solved. The receiving RFC checks for an existing document keyed on the planning reference before it creates anything.

Fail loudly, in one place. Errors surface in a single log the operations team can read, with enough context to identify which planning record failed and why — rather than being scattered across CI-DS run logs and SAP application logs.

Transformation belongs on the ABAP side. CI-DS moves data well. Business rules about what constitutes a valid planned order belong next to the system that enforces them, where they can be tested and where the next developer will look for them.

Result

Fifteen flows delivered inside a two-month window, connecting planning, execution and reporting. This project is the direct bridge between my two disciplines — the data engineering work and the ABAP work turned out to be the same problem viewed from opposite ends.

To expand: the CI-DS flow inventory, the idempotency check, and the error-log design.